Hydraulic Vibrator Pile Hammer for Construction Foundation

Product Details
Customization: Available
After-sales Service: Remote Technical Support
Warranty: One Year
Still deciding? Get samples of US$ 17500/Piece
Request Sample
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Quality Assurance
The supplier provides quality assurance
QA/QC Inspectors
The supplier has 1 QA and QC inspection staff
to see all verified strength labels (24)
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
  • Hydraulic Vibrator Pile Hammer for Construction Foundation
Find Similar Products

Basic Info.

Model NO.
PAB150
Type
Pile Hammer
Application
Various Types of Pipe Steel Plate
Certification
CE, ISO9001: 2000
Condition
New
Color
Customized
Operating Weight
1560kg
Working Flow
120lpm
Working Pressure
300 Bar
Max Turning
180°
Frequency
2500rpm
Transport Package
Container or Wooden Package
Specification
Steel
Trademark
PAB
Origin
China
HS Code
84314999
Production Capacity
10/Day

Product Description

Hydraulic Vibrator Pile Hammer for Construction Foundation

                     Hydraulic Vibrator Pile Hammer for Construction Foundation                                                  
                                                   Hydraulic Pile Hammer


Applicable object: Various types of pipe, steel plate, etc.

Main features: Using Q345 manganese plate steel, high strength and corrosion resistance;
                         The pin is made of 42CrMo alloy steel , with built -in oil passage, high strength and good toughness;
                          Rotary motor adopts Swiss imported motor;
                          The oil seal adopts the oil seal imported form Eaton in the United States to extend the service life;
                          The shock absorber adopts Korean Autox, with good toughness and fatigue resistance;
                          Integrated design, safe and stable, low failure rate.


 
Product Sepcifications:
 
Item/Model Unit PAB150 PAB250 PAB330 PAB350 PAB450
Suitable  Excavator ton .12-17 18-25 30-40 40-50 40-65
Eccentirc  Moment Nm 32 36 50 65 85
 Frequency   rpm 2500 2800 2800 2800 2800
Centrifugal  Force kN 172 265 420 580 750
Working Pressure bar 300 300 320 320 320
Working Flow lpm 120 155 168 210 255
Max Turning degree 180 180 180 180 180
Weight Main Body kg 1300 1900 2650 2900 3000
Extension Boom kg 260 400 650 650 650
Total Weight kg 1560 2300 3300 3550 3650
Feature Details
        Our hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.

      Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.
With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles, etc.

Hydraulic Vibrator Pile Hammer for Construction Foundation
Details image
1.Applied to driving and pulling steel plate, cement pile, steel rail, round pipe, steel H-pile, Lasson pile.
2. fast conversion between driving and pulling work.
3. less tension when pulling piles.
4. no damage to the bottom or top of steel plate and steel rail pile.
5. No damage to the buildings even working frequently nearby.
6. Silent work and short construction period, overcome environmental problems.


Hydraulic Vibrator Pile Hammer for Construction Foundation

Hydraulic Vibrator Pile Hammer for Construction FoundationHydraulic Vibrator Pile Hammer for Construction Foundation
Hydraulic Vibrator Pile Hammer for Construction FoundationPacking or Shipping 

   1. Inner is stretch film, outside is export wooden case or as customer's request.
   2.The standard free spare parts: one equipment, one hoses, one auxiliary arm, one set of repair tools with tool box, one certificate and one brochure.


Hydraulic Vibrator Pile Hammer for Construction Foundation1.What's the MOQ?
1 piece or unit.
 
2. How about the delivery time?
Based on order quantity, normally it takes 20 days for production. Only 3 to 7 days if we have stock on your request size.
 
3. How many years have you been producing hydraulic breakers and parts?
Over 20 years.
 
4. Quality & Service:
There will be strict inspection and testing for every order before shipping out. Our sales team and Technical Support will response for your question within 24 hours (Holidays Excluded). Free replacement will provide once the failure confirmed caused by our product quality.
 
5. What's the payment term?
T/T (Telegraphic Transfer) or Western Union. Pictures of products and packages will be sent to our customers before balance is paid.
 
6. Can you produce according to customers' design?
Yes, we can do customized products.
 
7. How about the package?
Standard exporting package.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier